Helland Bridge

Listed on the National Heritage List for England. Search over 400,000 listed places

Explore this list entry

Overview

Four-arch bridge, dating from the early-C15, partially rebuilt in the mid-C19, altered in the late-C19. Repaired in the C20 and C21.
Heritage Category:
Listed Building
Grade:
I
List Entry Number:
1327910
Date first listed:
06-Jun-1969
List Entry Name:
Helland Bridge
User submitted image
Contributed by Sandy Gerrard This photo may not represent the current condition of the site. Over 400,000 images and stories have been added to the Missing Pieces Project so far. Share your story.
View all

Location

Location of this list entry and nearby places that are also listed. Use our map search to find more listed places. 

There is a problem

Use of this mapping is subject to terms and conditions .

This map is for quick reference purposes only and may not be to scale.

What is the National Heritage List for England?

The National Heritage List for England is a unique register of our country's most significant historic buildings and sites. The places on the list are protected by law and most are not open to the public.

The list includes:

Icon Buildings
Icon Scheduled monuments
Icon Parks and gardens
Icon Battlefields
Icon Shipwrecks

Find out more about listing

Images of England Project

To view this image please use Firefox, Chrome, Safari, or Edge.
Archive image, may not represent current condition of site.
Date:
2007-05-03
Reference:
IOE01/16532/29
Rights:
© Mr John Midgley. Source: Historic England Archive

Local Heritage Hub

Unlock and explore hidden histories, aerial photography, and listed buildings and places for every county, district, city and major town across England.

Discover more

Official list entry

Heritage Category:
Listed Building
Grade:
I
List Entry Number:
1327910
Date first listed:
06-Jun-1969
Date of most recent amendment:
18-Nov-2021
List Entry Name:
Helland Bridge
Location Description:
NGR (centred): SX0652071500

The scope of legal protection for listed buildings

This List entry helps identify the building designated at this address for its special architectural or historic interest.

Unless the List entry states otherwise, it includes both the structure itself and any object or structure fixed to it (whether inside or outside) as well as any object or structure within the curtilage of the building.

For these purposes, to be included within the curtilage of the building, the object or structure must have formed part of the land since before 1st July 1948.

Understanding list entries

Corrections and minor amendments

The scope of legal protection for listed buildings

This List entry helps identify the building designated at this address for its special architectural or historic interest.

Unless the List entry states otherwise, it includes both the structure itself and any object or structure fixed to it (whether inside or outside) as well as any object or structure within the curtilage of the building.

For these purposes, to be included within the curtilage of the building, the object or structure must have formed part of the land since before 1st July 1948.

Understanding list entries

Corrections and minor amendments

Location

The building or site itself may lie within the boundary of more than one authority.

District:
Cornwall (Unitary Authority)
Parish:
St. Mabyn
District:
Cornwall (Unitary Authority)
Parish:
Helland
National Grid Reference:
SX 06523 71488

Summary

Four-arch bridge, dating from the early-C15, partially rebuilt in the mid-C19, altered in the late-C19. Repaired in the C20 and C21.

Reasons for Designation

Helland Bridge, near Bodmin, dating from the early-C15 with C19 alteration and rebuilding and later repairs, is listed at Grade I for the following principal reasons:

Architectural interest:

* as a well-documented early-C15 bridge which, although the parapets have been repaired and rebuilt, retains a good proportion of its early fabric;
* the principal structure is well-constructed using local materials including granite and slatestone, and the different phases of construction are evident.

Historic interest:

* it forms part of a historic route north from Bodmin to the coastal hinterland of the Camel estuary;
* repair and alterations in the C19 can be related to specific factors and contribute to its special interest.

History

Helland Bridge stands on an early route north out of Bodmin towards the village of St Mabyn and onwards to the coastal hinterland north-east of the Camel estuary. The River Camel marks the boundary of the parishes of St Mabyn to its north and Helland to its south. The bridge is located in a small hamlet with the same name and usually spelled Hellandbridge.

Helland Bridge was first mentioned in the Patent Rolls of 1381, which record that Stephyne Dyer of ‘Helland Brigge’ with others broke down a salmon weir on the Aleyn (Allen) at Dynemore (Dunmere). The bridge itself was first described by John Leland, the King’s Antiquary, in around 1535 as ‘the first memorable bridge on the Alane (Allen) is called Helham Bridge’; Allen is the historic name of the River Camel. In around 1580 John Norden recorded ‘Helenbr.’ on his map of Trigg Hundred, showing the river crossing and houses on the St Mabyn bank. It is named ‘Hellandbridg’ on further maps of 1699 and 1748. It is likely that there was a crossing point in this location prior to it first being recorded.

On the first Ordnance Survey (OS) of 1813, buildings are depicted grouped around the north and south approaches to the bridge. The 1842 Tithe map for St Mabyn shows the bridge in detail and depicts piers with triangular refuges. To the north of the bridge is a mill, and its head and tail races are also shown on the map. It is likely that by this date a further arch had been added to the north end of the bridge to accommodate these. On 16 July 1847, a flash flood swept down the River Camel, damaging Helland Bridge and rising over its parapets, but not causing the total destruction it wrought on most other bridges along the valley. The strongly-pointed arch north of centre and the adjacent cutwater were reconstructed following the incident. The 1881 OS map shows the mill, then for corn, along with its water system. A dump channel from the headrace passes under the bridge’s northern arch, cutting across what appears to be an earlier and abandoned channel further east along the headrace. It is likely that the two northern arches of the bridge were designed to span this earlier channel and may have been lengthened in response to the mill’s requirements, possibly replacing a causeway and floodwater-arch over the floodplain. The 1907 OS map shows that little had changed by the early years of the C20.

In the 1920s Helland Bridge was visited by the historian Charles Henderson and Henry Coates, a photographer. Henderson noted that the bridge was probably early C15 (by a comparison of styles) and was in perfect condition, although one arch had been rebuilt. He proclaimed it as ‘one of the finest old bridges in the west’.

The road across Helland Bridge lost its importance in the post-medieval period, with the preferred crossing point on the River Camel being downstream at Dunmere Bridge. Helland Bridge therefore became a secondary route.

Details

Four-arch bridge, dating from the early-C15, partially rebuilt in the mid-C19, altered in the late-C19. Repaired in the C20 and C21.

MATERIALS: slatestone rubble with slate voussoirs and granite copings.

DESCRIPTION: Helland Bridge spans the River Camel north to south with four arches, and is about 40m long and 3m wide. Each arch has a span of approximately 5m, between which are three piers with triangular cutwaters which continue up to road-level to form refuges. The central cutwater projects about 1.5m and the others slightly less. The southern arches are alike and have single rings of slate voussoirs flush with the sides of the bridge. The two arches to the north have two rings of slate voussoirs, the inner slightly recessed from the outer; the second arch from the north was rebuilt with a very pointed arch and there is disturbed masonry in the adjacent piers where replacement voussoirs have been inserted. The arches spring from a level up to 1m above the waterline. At the extreme north-end of the bridge is a smaller early-C19 round-headed arch constructed over the tailrace for the adjacent mill. The river channel is more silted-up beneath these northern arches, and this probably relates to the historic dump-channel from the mill.

The distance between the parapets is almost 3m wide near the centre of the bridge, gradually widening towards each end before splaying out to the width of the modern roadway (approximately 12m). This is particularly evident at the north end above the added early-C19 arch, but the parapet walls were all rebuilt in the late-C18 or early-C19 to accommodate the approach road at each end. The north end of the west parapet wall is supported by a large granite slab on granite corbels; these may be C20 in date and replace a series of bonded-in slabs. The parapet at the far north-east end is topped with C19 wrought-iron railings.

The parapet walls are approximately one-metre high and have chamfered granite coping stones, some with iron cramps, and may have been added following the 1847 flood. Parts of the parapet have been rebuilt following vehicular damage to the bridge. On the roadside of the parapet, at ground level, are some lengths of C20 granite kerbs and a series of granite kick-stones; early examples are rounded. At each end there are C21 traffic-calming measures.

Legacy

The contents of this record have been generated from a legacy data system.

Legacy System number:
67526
Legacy System:
LBS

Sources

Books and journals
Henderson, C, Coates, H, Old Cornish Bridges and Streams, (1928)

Websites
Heritage Gateway: Cornwall & Scilly HER: Helland Bridge, accessed 23/06/2021 from https://www.heritagegateway.org.uk/Gateway/Results_Single.aspx?uid=MCO9582&resourceID=1020

Other
Tithe Map, St Mabyn parish (1842)
Tithe map, Helland parish (1840)
Ordnance Survey, Cornwall (1880; 1:2500)
Ordnance Survey, Cornwall (1907; 1:2500)
Nigel Thomas / Cornwall Archaeological Unit. Helland Bridge, Cornwall: Archaeological and Historical Assessment. June 2000.

Legal

This building is listed under the Planning (Listed Buildings and Conservation Areas) Act 1990 as amended for its special architectural or historic interest.

Ordnance survey map of Helland Bridge

Map

This map is for quick reference purposes only and may not be to scale. This copy shows the entry on 08-Jun-2026 at 03:35:51.

Download a full scale map (PDF)
© Crown copyright [and database rights] 2026. OS AC0000815036. Use of this mapping is subject to Terms and Conditions.

End of official list entry

All text content is available under the Open Government Licence v3.0 , except where otherwise stated. Any supplied maps are © Crown Copyright [and database rights] 2026 OS AC0000815036 and may not be reproduced without permission.

Previous Overview
Next Comments and Photos